Bore-Gard
®
Installation - 220 ft.
Long Island, NY
Pipe Pull Force Data
Maximum 1,560 lbs.
Note: Pull force data generated from self-contained on-board strain gauge and data gathering computer mounted between pipe
lead end and reamer. Data samples taken at a rate of 10 per second. See picture below.
]
Left: The data in the graph above was
generated by our state-of-the-art, self-
contained force measuring computer capable
of measuring both tensile and compressive
loads. It is protected by a steel cylinder and
mounted on swivels at both ends. Data was
sampled 10 times per second. This leading-
edge technology has enabled Carlon to
determine the actual loading on the pipe as
it is being pulled through the ground. This is
the first known application of such high
technology to the development and
application of pipe for boring applications.
0 7736.7Time (Secs)
-500
2000
Load (lbs)
NY12798.DAT-TimeHist.Load_cell
Pulling Eye
attached to
Bore-Gard
p
ipe
Pull-Force
Measuring
Computer
Reamer
Gross Automation (877) 268-3700 · www.carlonsales.com · [email protected]
Page view 0
1

Summary of Contents

Page 1 - Installation - 220 ft

Bore-Gard® Installation - 220 ft.Long Island, NYPipe Pull Force DataMaximum 1,560 lbs.Note: Pull force data generated from self-contained on-board str

Comments to this Manuals

No comments